CURRENT STATUS

Build the evidence
before flight.

Plans, concepts, implementation, testing, approvals, and sales are not the same thing. We publish what exists today and what does not on the same page.

  • Requirements in development
  • No flight attempt yet
  • No travel bookings or sales

NICOLAUS 1 · NEXT STEPS

Toward our first flight.
Start with how to verify it.

Our current focus is Nicolaus 1, our first planned uncrewed rocket. Its mission plan defines success through reaching at least 100 km, transmitting and storing data, an ocean splashdown, and finding and recovering the vehicle. The next work is to specify measurement methods and acceptance criteria, and establish the conditions for design, testing and independent review.

WHAT IS TRUE TODAY

No exaggeration about where we stand.

Exists3
  • Mission requirements and a public roadmap
  • Selected Nicolaus exterior concept for publication
  • Version-controlled engine-layout concept
Not implemented / Not established7
  • Nicolaus or Kepler flight hardware
  • Nicolaus-specific measured validation or a formal mission simulation
  • Hardware integration or flight-performance models validated against measured data
  • A dedicated factory, launch site, island, or recovery port
  • Flight authorization, insurance, or an independent safety organization
  • Flight Ready status or an in-orbit energy demonstration
  • Space-travel reservations, sales, or operations

SAFETY GATES

Neither dates nor AI
can bypass a gate.

Combustion, high-pressure work, hazardous battery testing, real-vehicle manufacturing, and real-vehicle flight remain on Hold until qualified leaders, location, funding, legal conditions, approvals, and recovery systems are established.

G0Not assessed

Documents and plans exist. No gate passage has been declared.

G1Hold

Required evidence and independent review are incomplete.

G2Hold

Required evidence and independent review are incomplete.

G3Hold

Required evidence and independent review are incomplete.

G4Hold

Required evidence and independent review are incomplete.

G5Hold

Required evidence and independent review are incomplete.

G6Hold

Required evidence and independent review are incomplete.

G7Hold

Required evidence and independent review are incomplete.

G8Hold

Required evidence and independent review are incomplete.

G9 HUMANNot reached

The program has not yet reached physical development or flight.

HOW TO READ THIS SITE

How to read our status labels.

Decided

Adopted as an internal company direction. It does not mean regulatory or third-party approval, implementation, contract, authorization, sale, or demonstration.

Design target

A numerical or performance objective. It is not a guaranteed value before simulation, testing, and review.

Concept

A long-term direction. It does not establish technical feasibility or a commercial business.

OPEN

An unresolved item to be closed through later design, research, testing, or contracts.

Not implemented

The relevant function, hardware, or operation does not yet exist. Plans and design targets are identified separately.

Hold

No execution because required gates remain incomplete.

NEXT MEASURABLE WORK

Connect what we can do today
to future flight.

  1. 01Finalize Nicolaus 1 requirements and complete-success criteria
  2. 02Apply mission inputs to numerical experiments and record reproducible results
  3. 03Research and document the preliminary design and safety requirements
  4. 04Build and inspect a non-flying appearance model after review
  5. 05Document conditions for people, location, funding, approvals, insurance, and recovery